Project
Director, Transportation:
Owen Peery
The Project
RK&K was the Lead Designer for the Route 29 Solutions Design-Build project which consisted of three distinct ‘elements’ bundled into a single D-B contract.
The three elements were: Route 29 and Rio Road Grade Separated Intersection; Route 29 Widening from four lanes to six lanes from Polo Grounds Road to Towncenter Drive; and Berkmar Drive Extension of 2.3 miles on new alignment from Hilton Heights Road to Towncenter Drive.
This project was the Overall Winner for the VTCA) 2017 Engineering Awards and the coveted ACEC 2018 Pinnacle Award for Engineering Excellence and Grand Award for the Virginia Department of Transportation. It also was awarded the Design-Build Excellence in Engineering Award by DBIA Mid-Atlantic.