Project
Miles of Roadway Improved
Manager, Geotechnical:
Jennifer Trimble
The Project
RK&K was responsible for the preparation of construction documents, including geotechnical engineering reports (GERs), addressing improvements to approximately 6.5 miles of I-95 and the MD 43 interchange.
Geotechnical design elements included; roadway subgrade, flexible pavement design, retaining walls, multi-span bridges, stormwater management facilities, utility tunnels, and protection of a 108-inch water main.