Project
Project Manager:
Greg Goins
The Project
As the lead designer for the widening of approximately 3.3 miles of I-40 to a six-lane divided facility with a minimum 26-foot median, RK&K provided geotechnical engineering recommendations for the roadway, pedestrian bridge, culverts, sound barriers, overhead signs, and reinforced soil slopes.