The Project

As the lead designer for the widening of approximately 3.3 miles of I-40 to a six-lane divided facility with a minimum 26-foot median, RK&K provided geotechnical engineering recommendations for the roadway, pedestrian bridge, culverts, sound barriers, overhead signs, and reinforced soil slopes.

“This project offered unique geotechnical challenges, from a variable rock line and scour at the drilled shaft bents, to batter pipe piles, a reinforced soil slope and a pedestrian bridge supported on a shallow foundation on top of an MSE.”

Greg Goins, Project Manager