$0M
Project
Project Manager:

Allison Scott Berkheimer

The Project

RK&K provided many services for the I-695 / Charles Street Interchange Reconstruction project, including:

  • Project Planning / Phasing Studies
  • Final Highway and Drainage / SWM / ESC Design
  • Pedestrian / ADA / Bicycle, Parking, Lighting / Signal / Signing / ITS / Pavement Markings, Structural for Retaining Walls / Charles Street Pier / I-695 Over Light Rail Bridge Rehabilitation
  • Structural Inspection for Light Rail Bridge
  • Geotechnical Engineering for Bridge, Retaining Walls, Sign Structures
  • Noise Analysis
  • Traffic Data Collection, Analysis
  • Utility Coordination / Design
  • Maintenance of Traffic
  • Public Outreach
  • Permitting
  • NEPA Support
  • FHWA Coordination (IAPA, TMP)
  • Construction Phase Services, Including Inspection / Project Management Support
  • Partnering

“The RK&K/SHA teamwork was so instrumental to the project's success that it was the best one I’ve worked on at RK&K. Every time I drive through, I always mention how proud I am to have worked on it!”

Allison Scott Berkheimer, Project Manager

Related Projects

See More Projects

You might also be interested in:

Ready to work with us? Let’s get started.