The Project
RK&K is providing construction engineering and inspection (CEI) services and engineering support for this project, which includes: extending the new C-D roadway from the Newtown interchange to the Witchduck Road Interchange; reconfiguring the Newtown Road interchange ramps south of I-264; reconfiguring the Witchduck Road interchange ramps south of I-264; and constructing an overpass between the two interchanges that connects Greenwich Road on the south side of I-264 and Cleveland Street on the north side. Project elements include grading, drainage, utilities, asphalt pavement, new bridge construction, widening of existing bridge structures, retaining wall construction, and geotechnical services.